Pic of our off site PC yard which is ard 30 mins from our project site. I will be working in here in ard early mar.


The pc yard with the production line


This is a stock up for letting the facade to rest on it


This is the facade which consist of column/wall/beam


A mock up on the site which assemble each of the pc components


Close up of the top portion of the mock up, shows the connection of the beam with the column


This paveway is build by the workers when they are free as they are awaiting shop drawings approval before they can begin to cast our pc components.


A mock up using wall formwork for casting


This is the pc half slab


Rebar cage for the beam


Rebar cage is put into the mould


The white circular thing is for making an opening in the beam when casting


When the anchor bars are bend down (usually bend up or go straight), need to dig a hole in the lean concrete surface.


A box up for casting a void in the beam for secondary beam to anchor in


The casted pc beams all wraped up and kept moist for curing